Homework Question on Project Motorcycle
- You are a project manager for a medium-sized manufacturer of motorcycle cruisers. The engines in motorcycle cruisers, like the ones you manufacture, are usually categorized by size rather than the number of cylinders. In the past, your company has successfully manufactured and marketed the best-selling of these fuel-efficient cruisers that occupy the middleweight class. The rather nebulous middleweight class comprises motorcycles broadly ranging in engine size from 500 cubic centimeters, or cc, to 1000 cc. Executives at your company are now interested in motorcycles with larger motors and would eventually like to produce motorcycles in the touring class, specifically designed to excel at covering long distances with motors larger than 1100 cc. The proposed target market for these larger motorcycles consists of males between the ages of 35 and 60 in global markets. Price points for the larger motorcycles cover income ranges from $55,000 to $100,000. Management has decided that your company will meet the objectives stated herein within the next five (5) years. During the proposed changeover, the company will continue to manufacture the middleweight cruisers to serve its existing clientele.
- Select one (1) of the types of project organization that would suit the development of the larger touring class motorcycles. Outline the process steps that your company would take in order to develop the motorcycle. Provide a rationale for the response.
- Recommend one (1) strategy to the senior executives that the organization might use to balance short- and long-term needs. Specify the crucial resources that you would need as a project manager to run the existing business interests at the same time that the business changes to the production of touring class motorcycles.
- Suggest the project management leadership style that is most conducive to overseeing the operation of the business growth plan.
- Recommend at least three (3) risk mitigation strategies to address project plan details that might be forgotten or overlooked. Justify the selection.
- Use at least three (3) quality references.
- Note: Wikipedia and other Websites do not quality as academic resources.
- Your assignment must follow these formatting requirements Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format
Homework Answer on Project Motorcycle
Introduction
This study reviews the project organization taken to meet the new demand of manufacturing a new model of a motorcycle with an engine capacity of 1,100cc. The company is focused on motorcycle production, and has been making medium sized motorcycle cruisers. The new demand must meet the touring class design, be able to cover long distances with motor engine of above 1,100cc. This design is to target male customers of between 35-60 years of age and from international regions.
Background
As a project manager of a medium-sized manufacturer of motorcycle cruisers, there are responsibilities related to this position. Engine parts of motorcycle cruisers are mainly classified by size instead of number of cylinders. Previously, the company has manufactured and sold the best middle class cruisers. This middleweight class comprises the motorcycles with engine sizes ranging from 500cc to 1,000cc. Presently, company executives desire motorcycles with larger motors.
They would desire to produce motorcycles of the touring class. The desired machines should be able to cover long distances with motors above 1,100cc. The proposed targets are males of ages 35-60 in international markets. Proposed prices should be within an income of $55,000-100,000. According to the management, these objectives will be met within the coming five years. In the meantime, there would be production of the middleweight cruisers to meet the needs of the present clientele.